Free forever plan — no credit card needed. Upgrade when you're ready.
Manufacturing

BOMs, manufacturing orders and cost per run

Manufacturing software for India: write the recipe, check materials before release, issue them on a slip and record output shift by shift, with stock and cost kept right.

What goes wrong today

  • Recipes kept in a spreadsheet nobody updates so the floor works from an old version
  • A shortage found halfway through a run instead of before the order was released
  • The same material promised to two jobs because nothing is set aside when work starts
  • Cost per unit worked out once a year with scrap and offcuts left out of it
IN THIS VIDEO
  • A BOM with a scrap allowance, a saleable scrap line and conversion cost per run
  • Revising an active BOM: a draft copy is edited while the active one stays untouched
  • A manufacturing order showing a shortage, and a draft purchase request raised for it
  • Releasing an order to reserve materials, then handing them over on a store issue slip
  • Recording production in two shifts, each with its own output, scrap and cost per unit
Watch Manufacturing: recipes, scrap, orders and cost per unit

How a production order works in Centrik

  1. 1

    Write the bill of materials

    List the components per unit with a scrap allowance, add scrap or by-product lines with their recovery value, and set the labour or overhead cost per run. A new BOM starts as a draft and is activated when it looks right.

  2. 2

    Raise and check the order

    Create a manufacturing order from a BOM, ad hoc, or against a sales order. The availability check compares needs with free stock, and a shortfall can become a draft purchase request.

  3. 3

    Release and issue materials

    Releasing the order reserves its materials at the source location. A store issue slip then hands them to the floor, in full or in part, ready to print for signatures.

  4. 4

    Record each run

    Record good units and scrap per shift. Raw materials leave stock, and finished goods, scrap and by-products arrive at the output location at their cost.

What you get with manufacturing

Bills of materials

  • Components, scrap allowance, by-products, and labour or overhead cost per run
  • Estimated cost per unit before you produce, net of what scrap and by-products can be sold for
  • Draft, active and default BOMs per product
  • Revise a BOM without losing the old one: every change is kept in history

Manufacturing orders

  • Orders from a BOM, ad hoc for one-off jobs, or made to order against a sales order
  • Material availability check before release, with a draft purchase request for any shortfall
  • Release reserves materials at the source location, so no one else promises them
  • Optional approval before an order is released, and on store issue slips

Store issue and production

  • Store issue slips against a manufacturing order or straight to a department, printable for signatures
  • Record output in one or more runs, and cancel a run that was entered by mistake
  • Each run shows output, scrap, materials actually used and cost per unit

Traceability and reports

  • Batch, serial number and expiry on finished goods
  • Trace any finished batch back to the raw-material batches it was made from
  • Consumption variance and material-used reports: standard against actual, per order and per material
  • Send work outside on a challan with job work, and file ITC-04 from it

Keep reading

Frequently Asked Questions

An active BOM is never edited in place. You create a revision, which opens as a draft copy. When you activate it, the old revision is retired but kept, and the history shows what changed.

See your own BOM in Centrik.

Book a 30-minute demo and we'll build a recipe and a manufacturing order using your products.